A Building and Electrical Permit are required. A spec sheet on the unit being installed. A site plan showing location or proposed generator, septic and well location. A site plan showing location of proposed generator, proposed or existing lp tanks, septic, and well. Show distances from generator and lp tanks to property line, dwelling unit ... read more
A Footprint packet (bldg., zoning, wetlands, and sanitation application) available under downloadable forms.
For Residential roof-top solar, a Building and Electrical Permit with a Eversource Workorder#, and plans (11″x17″) . Call for special pricing. For Residential Ground-Mounted Solar or All Commercial Solar- a Footprint Packet is required, full site plan (24″ x 36″) size, use Fee Schedule (Footprint packet fee).
No, unless the lot does not have frontage on a public street, the lot has been owned distinctively and separately from any other lot since May 25, 1957, and the lot does not abut any other land under the same ownership that has frontage on a public street.
You are allowed one resident name sign not exceeding two square feet in area and not illuminated.
If there is a unique situation where a hardship can be established that is related to your property and is not common to every other property, you may apply to the Zoning Board of Appeals for a variance.
All structures are required to be 30 feet off the side and rear property lines, 40 feet from the front property line and 100 feet from any wetlands.
Three horses are allowed on the first two acres, and three horses for each acre after that. Horses may not be kept on a lot of less than two acres.
See section 500-43 (A) (10) for all the details It can only be operational Sept 15 – June 1