A Building and Electrical Permit are required. A spec sheet on the unit being installed. A site plan showing location or proposed generator, septic and well location.

A site plan showing location of proposed generator, proposed or existing lp tanks, septic, and well.  Show distances from generator and lp tanks to property line, dwelling unit or outbuilding, septic and well.

Administrative Zoning Application and Wetlands Review Forms are also required effective 10-1-24.